For Northavon Group & South West Water

For this project, we were asked to assist Northavon with the installation of a new foul tank system, with the overall aim of increasing the capacity of the site to be able to handle double the current foul water flow rate.

Works carried out include; leveling and setting out of tanks, installation of kiosks, piping up tanks, installing sludge lines, excavation and installation of ducting, and overall site control and assistance.